Gate 1
Register & declare
Say which AI is in use before it touches the work.
The methodology
Six gates, from the moment an AI tool enters a project to the moment a deliverable is sealed. Each one leaves a record, so what a carrier or a board eventually asks about can be shown rather than asserted.
Records, not verdicts. The methodology documents that a licensed professional exercised responsible charge. It does not score the tool, rate the vendor, or judge the engineering — that judgment is the professional’s, and stays theirs.
1 · Why gates
Responsible charge is not something exercised at the end. It is the direction given before the work starts, the judgment applied while it is produced, and the review that happens before anything enters a sealed deliverable. A signature at the end records the conclusion of that sequence — it does not substitute for it.
So the methodology is a sequence too. Each gate is a point where something is decided and recorded while it is still true, rather than reconstructed afterward from memory. A record assembled after a claim arrives is worth considerably less than one written as the work was done.
2 · The flow
This is the shape of the work. What each gate asks for in detail — and what it takes to satisfy one — is part of the working platform.
Gate 1
Register & declare
Say which AI is in use before it touches the work.
Gate 2
Define task & competence
State what the AI is being asked to do, and who is competent to judge the result.
Gate 3
Qualify the tool
Establish the tool is fit for this task, on this project.
Three ways in
· Existing tool
· Built for this project
· Reusable tool, re-qualified
Gate 4
Direct & develop
The professional sets the approach and stays in charge while the work is produced.
Gate 5
Verify
Check the output against the professional’s own judgment before it goes anywhere.
Gate 6
Seal & preserve
Sign, and freeze the record of who was accountable and how.
A tool can enter the work in one of three ways, and gate 3 is where that is settled. The rest of the sequence is the same whichever way it arrived.
3 · What each gate records
Register & declare
A declaration: which AI is in use on this deliverable — or that none is.
Define task & competence
A competence statement: the task, and the licensed professional’s basis for judging the result.
Qualify the tool
A qualification record: that the tool was found fit for this task, on this project — and by which of the three ways it entered.
Direct & develop
A direction record: the inputs, assumptions, and acceptance criteria the professional set, and their engagement as the work was produced.
Verify
A verification artifact: the independent check performed, and the disposition — adopted, corrected, rejected, or overridden.
Seal & preserve
A frozen seal record: who was accountable, the licence held at signing, and the artifacts behind the decision.
None of these is a score. Each is a fact about what happened and who was accountable for it, recorded at the time and kept.
4 · The record
For each sealed deliverable that AI touched, the gates produce one responsibility-chain record: who was accountable, with the licence they held at the moment of signing; which AI touched which deliverable and the role it played; that the professional directed and reviewed the work before it was sealed, rather than after; and all of it time-stamped and preserved.
It is proof of accountability, not a judgment of the engineering. The professional’s judgment stays theirs — the record makes the fact that they exercised it provable.
5 · What this does not claim
6 · Status
What is published here is the framework: the gates, their order, and what each is for. The detail of what satisfies a gate is part of the working platform and is being built in conversation with the profession — with licensed practitioners, and with the carriers and brokers who price this risk.
It is written by a practicing professional engineer who seals work under the same rules it documents, and it will change as the standards and the law it tracks change.
The research is free to read and published in full. The tooling that applies this methodology is in development.